Clients & Projects
Stories, synergy and more
Exploring the meticulous planning behind our projects, from high-containment labs to industrial efficiency, designed for long-term value.

Automotive Showroom (Showroom Mobil Mewah)
PT. Auto Galeri Indonesia
The showroom floor was equipped with specialized, high-CRI (Color Rendering Index) track lighting systems specifically calibrated in lux and color temperature to enhance the metallic flakes and curves of the luxury vehicles’ paint finishes. In the service center, we installed heavy-duty three-phase power supplies, pre-cast underground cable trenches, and a centralized, high-volume compressed air distribution system to power the heavy hydraulic vehicle lifts and pneumatic tools.
Luxury Villa (Villa Tropis Bali)
Mr. James Harrison
The comprehensive installation integrated dynamic architectural lighting, multi-zone variable refrigerant flow (VRF) climate control, biometric security, and premium audio-visual systems into a single, intuitive centralized touch-panel interface. Furthermore, we designed and installed a highly efficient, whisper-quiet inverter heat pump system capable of rapidly heating the massive 25-meter infinity pool while consuming minimal electricity.
Logistics Warehouse (Gudang Logistik Bekasi)
PT. Jalur Distribusi Cepat
The massive facility was outfitted with over a thousand motion-sensored, high-lumen LED high-bay fixtures programmed with daylight harvesting capabilities to dim automatically when natural light is sufficient. For climate control, instead of energy-heavy air conditioning, we installed a strategic array of massive High-Volume Low-Speed (HVLS) fans paired with automated ridge vents to create continuous, cooling air circulation throughout the cavernous space.
Hospital Renovation (Renovasi RS Medika)
Yayasan Sehat Selalu
The installation encompassed surgical-grade copper piping for oxygen, nitrous oxide, medical compressed air, and strong vacuum systems, all rigorously tested for purity and pressure integrity. Alongside this, we installed a state-of-the-art 2MVA synchronized diesel generator system paired with an intelligent Automatic Transfer Switch (ATS) and clinical-grade Uninterruptible Power Supplies (UPS) to guarantee zero-millisecond power interruption to life-saving equipment.
Manufacturing Plant (Pabrik Tekstil Karawang)
PT. Global Manufacturing
Our scope included the installation of kilometers of heavy-duty overhead cable trays, the setup of multiple dedicated step-down transformers (20kV to 380V), and the assembly of main low-voltage switchgears. Simultaneously, we engineered and welded a complex network of high-pressure, seamless stainless-steel pipes connected to dual rotary screw air compressors equipped with advanced desiccant air dryers.
Apartment Complex (Apartemen Green Lake)
Developer Hunian Nyaman
The execution involved drilling and integrating deep-well submersible pumps, establishing a massive underground reservoir, and installing a multi-stage booster pump system with Pressure Reducing Valves (PRVs) to ensure consistent water pressure across all 35 floors. Furthermore, we deployed a fully automated, addressable fire sprinkler system, complete with jockey pumps and seamless integration into the central fire alarm matrix.
Office Building (Gedung Perkantoran Sudirman)
PT. Maju Jaya Bersama
The detailed scope of work encompassed the dismantling of outdated rooftop chillers and the installation of three high-efficiency, variable-speed magnetic bearing chillers. We also implemented a fully integrated Building Management System (BMS), deployed smart daylight-harvesting lighting controls across all tenant floors, and completely upgraded the main power distribution panels, including the installation of new cast-resin transformers and intelligent busduct systems for secure power delivery.
IHVCB UNIVERSITAS INDONESIA
Institute of Human Virology and Cancer Biology – Universitas Indonesia
Known as IHVCB-UI, it’s a laboratory facility that has one Biosafety Level 3 (BSL-3) lab and four Biosafety Level 2 (BSL-2) labs. It’s the first facility in Indonesia that has been certified by World BioHazTec, an international certifier of these types of labs. Under the direction of Ibu Kartini Mulyadi in 2006, IHVCB-UI upgraded their existing BSL-2 into a BSL 3 and created the additional BSL-2s. As a result of the aviant flu outbreak during that year, it was decided that Indonesian researchers require better laboratories that ensure the safety of surrounding community, scientists and their samples.
ERHA CLINIC SURABAYA
Erha Clinic Group
Erha Clinic is a modern dermatologist clinic that provides a unique atmosphere for their clients. Erha Clinic Surabaya fulfills the needs and demands for a health facility in eastern Java. With colonial exterior and interior design, customers are greeted by splendor as well as warmth. In addition to its lighting design that complements the beauty of the building, Erha Clinic Surabaya is truly a breakthrough in medical field.