Trisakti Mekar Mandiri
  • Home
  • About Us
  • Product & Services
  • Clients & Projects
  • Contact Us
Select Page

Logistics Warehouse (Gudang Logistik Bekasi)

PT. Jalur Distribusi Cepat

February 23, 2026

Profile

The massive facility was outfitted with over a thousand motion-sensored, high-lumen LED high-bay fixtures programmed with daylight harvesting capabilities to dim automatically when natural light is sufficient. For climate control, instead of energy-heavy air conditioning, we installed a strategic array of massive High-Volume Low-Speed (HVLS) fans paired with automated ridge vents to create continuous, cooling air circulation throughout the cavernous space.

Architect

Warehouse Planner Co.

Civil Contractor

PT. Beton Cor Mas

ME Engineering

PT. Trisakti Mekarmandiri

Additional Information

We were tasked with the full design and build of the lighting, power distribution, and industrial ventilation systems for a colossal 50,000 square meter, high-bay logistics and distribution center. The design needed to maximize energy efficiency while ensuring optimal visibility, safety, and comfort for hundreds of warehouse operators and forklift drivers.

45

We plan and build with heart

Delivering integrated infrastructure solutions since 1988. As a trusted Mechanical & Electrical Specialist , we continuously plan and build with heart.



Jl. Kedoya Duri Raya A2/4 Taman Kedoya Baru Jakarta – 11520 Indonesia



+6221 580 4651
+6221 580 4652



info@trisaktimm.com

©2026 PT. Trisakti Mekarmandiri. All rights reserved

Chat with us
Chat with Trisakti Mekarmandiri
HelloHi there 👋, welcome to Trisakti Mekar Mandiri
Have a project in mind? Let's discuss how we can bring it to life.
Start Conversation