Hospital Renovation (Renovasi RS Medika)

Yayasan Sehat Selalu

February 23, 2026

Profile

The installation encompassed surgical-grade copper piping for oxygen, nitrous oxide, medical compressed air, and strong vacuum systems, all rigorously tested for purity and pressure integrity. Alongside this, we installed a state-of-the-art 2MVA synchronized diesel generator system paired with an intelligent Automatic Transfer Switch (ATS) and clinical-grade Uninterruptible Power Supplies (UPS) to guarantee zero-millisecond power interruption to life-saving equipment.

Architect

Medika Architect Group

Civil Contractor

CV. Interior Prima

ME Engineering

PT. Trisakti Mekarmandiri

Additional Information

This critical infrastructure project focused on the complete upgrading and expansion of the life-support medical gas pipeline networks and the emergency backup power generation systems for an active, highly trafficked hospital wing, including a newly added intensive care unit (ICU) and three surgical operating theaters.

Solution

We executed this critical milestone by establishing a temporary, localized manifold system with high-capacity gas cylinders directly inside the ICU to bypass the main line. The actual pipe cutting, brazing, and tie-in of the main network were rehearsed extensively and executed during a carefully coordinated, meticulously planned 15-minute maintenance window at 3:00 AM, utilizing HEPA-filtered containment tents to maintain absolute sterility.

Interesting Experience

The most nerve-wracking phase was the requirement to tie the newly installed medical gas lines directly into the hospital’s existing, active network. We had to perform this delicate integration without shutting down or jeopardizing the gas supply to the patients currently on ventilators in the adjacent cardiovascular intensive care unit.

\

TESTIMONIAL

“

“Undertaking major engineering works within a sterile healthcare environment requires an immense level of care, discipline, and understanding of clinical priorities. The engineering team maintained impeccable cleanliness, strict infection control protocols, and open communication throughout the project. Their execution ensured that our critical patient care was never compromised for a single second.”

Dr. Amanda Cole – Head of Operations

45

We plan and build with heart

Delivering integrated infrastructure solutions since 1988. As a trusted Mechanical & Electrical Specialist , we continuously plan and build with heart.



Jl. Kedoya Duri Raya A2/4 Taman Kedoya Baru Jakarta – 11520 Indonesia



+6221 580 4651
+6221 580 4652



info@trisaktimm.com

©2026 PT. Trisakti Mekarmandiri. All rights reserved

Chat with us
Chat with Trisakti Mekarmandiri
HelloHi there 👋, welcome to Trisakti Mekar Mandiri
Have a project in mind? Let's discuss how we can bring it to life.
Start Conversation